Informasi
Lamaran ini telah expired
Posisi ini sudah melewati batas waktu lamaran. Kamu masih bisa membaca detail pekerjaan dan melihat rekomendasi lowongan serupa di bawah.
JOB DESCRIPTION
JOB DESCRIPTION:
INTEGRATED RESOURCE PLANNING
- COMPREHENSIVE MANPOWER PLANNING: DEVELOP AND MANAGE THE SOC MANPOWER MODEL, ENSURING STAFFING
LEVELS ARE OPTIMIZED FOR PEAK AND NON-PEAK PERIODS, IN ALIGNMENT WITH MACHINE BY STATIONS AND PRODUCTIVITY
FEASIBILITY
- ASSET & EQUIPMENT FORECASTING COOPERATE WITH ASSET AND COSTING TEAM: PROJECT REQUIREMENTS FOR NON-HUMAN
RESOURCES (E.G., PALLETS, CAGES, HAND-JACKS, SCANNERS) BASED ON PROJECTED THROUGHPUT AND PROJECT TIMELINES.
- CROSS-FUNCTIONAL ALIGNMENT: WORK CLOSELY WITH THE PROJECT MANAGEMENT OFFICE (PMO) TO ENSURE RESOURCE
AVAILABILITY MATCHES THE LAUNCH DATES OF NEW SOC, EXPANSION ZONES, OR PROCESS CHANGES.
CONTINUOUS IMPROVEMENT & INITIATIVES
- MANPOWER INITIATIVE LEAD: IDENTIFY PRODUCTIVITY GAPS AND IMPLEMENT MANPOWER INITIATIVES (E.G., INCENTIVE
SCHEMES, SHIFT RESTRUCTURING, OR CROSS-TRAINING MODULES) TO BOOST PPH.
- PROCESS OPTIMIZATION: LEAD CONTINUOUS IMPROVEMENT (CI) PROJECTS USING LEAN OR SIX SIGMA METHODOLOGIES
TO REDUCE WASTE IN RESOURCE UTILIZATION.
- PERFORMANCE ANALYTICS: AUDIT THE RESOURCE VS. OUTPUT EFFICIENCY AND PRESENT DATA-DRIVEN
RECOMMENDATIONS TO SENIOR LEADERSHIP.
REGIONAL AND CMM INTEGRATION
- WORK WITH CMM, SERVE AS THE LOCAL LEAD FOR THE REGIONAL MODEL/ PPH OPTIMIZATION ALGORITHM, TRANSLATING
TECHNICAL OUTPUTS INTO REAL-WORLD ASSET AND LABOR PLANS.
STAKEHOLDER COORDINATION
- WORK WITH RELATED PARTIES IE COSTING TEAM, ASSET TEAM, OPX, SWP TO ENSURE CONTINUOUS IMPROVEMENT.
REQUIREMENTS:
- BACHELOR'S DEGREE IN INDUSTRIAL ENGINEERING, SUPPLY CHAIN, OR OPERATIONS MANAGEMENT.
- EXPERIENCE 4-6 YEARS IN A HIGH-VOLUME SORTATION CENTER OR WAREHOUSE ENVIRONMENT PROVEN EXPERIENCE
IN RESOURCE PLANNING AND PROJECT MANAGEMENT.
- ABILITY TO BUILD TIMELINES THAT SYNCHRONIZE HC, ASSETS (PALLETS/EQUIPMENT), AND OPERATIONAL MILESTONES.
- ABILITY TO TRANSFORM RAW VOLUME DATA INTO A PHYSICAL RESOURCE REQUIREMENT PLAN AND PLUG IN WITH OTHERS FACTOR IE ARRIVAL CURVE, FFM RATE, MACHINE PPH ETC
JOB DESCRIPTION:
INTEGRATED RESOURCE PLANNING
- COMPREHENSIVE MANPOWER PLANNING: DEVELOP AND MANAGE THE SOC MANPOWER MODEL, ENSURING STAFFING
LEVELS ARE OPTIMIZED FOR PEAK AND NON-PEAK PERIODS, IN ALIGNMENT WITH MACHINE BY STATIONS AND PRODUCTIVITY
FEASIBILITY
- ASSET & EQUIPMENT FORECASTING COOPERATE WITH ASSET AND COSTING TEAM: PROJECT REQUIREMENTS FOR NON-HUMAN
RESOURCES (E.G., PALLETS, CAGES, HAND-JACKS, SCANNERS) BASED ON PROJECTED THROUGHPUT AND PROJECT TIMELINES.
- CROSS-FUNCTIONAL ALIGNMENT: WORK CLOSELY WITH THE PROJECT MANAGEMENT OFFICE (PMO) TO ENSURE RESOURCE
AVAILABILITY MATCHES THE LAUNCH DATES OF NEW SOC, EXPANSION ZONES, OR PROCESS CHANGES.
CONTINUOUS IMPROVEMENT & INITIATIVES
- MANPOWER INITIATIVE LEAD: IDENTIFY PRODUCTIVITY GAPS AND IMPLEMENT MANPOWER INITIATIVES (E.G., INCENTIVE
SCHEMES, SHIFT RESTRUCTURING, OR CROSS-TRAINING MODULES) TO BOOST PPH.
- PROCESS OPTIMIZATION: LEAD CONTINUOUS IMPROVEMENT (CI) PROJECTS USING LEAN OR SIX SIGMA METHODOLOGIES
TO REDUCE WASTE IN RESOURCE UTILIZATION.
- PERFORMANCE ANALYTICS: AUDIT THE RESOURCE VS. OUTPUT EFFICIENCY AND PRESENT DATA-DRIVEN
RECOMMENDATIONS TO SENIOR LEADERSHIP.
REGIONAL AND CMM INTEGRATION
- WORK WITH CMM, SERVE AS THE LOCAL LEAD FOR THE REGIONAL MODEL/ PPH OPTIMIZATION ALGORITHM, TRANSLATING
TECHNICAL OUTPUTS INTO REAL-WORLD ASSET AND LABOR PLANS.
STAKEHOLDER COORDINATION
- WORK WITH RELATED PARTIES IE COSTING TEAM, ASSET TEAM, OPX, SWP TO ENSURE CONTINUOUS IMPROVEMENT.
REQUIREMENTS:
- BACHELOR'S DEGREE IN INDUSTRIAL ENGINEERING, SUPPLY CHAIN, OR OPERATIONS MANAGEMENT.
- EXPERIENCE 4-6 YEARS IN A HIGH-VOLUME SORTATION CENTER OR WAREHOUSE ENVIRONMENT PROVEN EXPERIENCE
IN RESOURCE PLANNING AND PROJECT MANAGEMENT.
- ABILITY TO BUILD TIMELINES THAT SYNCHRONIZE HC, ASSETS (PALLETS/EQUIPMENT), AND OPERATIONAL MILESTONES.
- ABILITY TO TRANSFORM RAW VOLUME DATA INTO A PHYSICAL RESOURCE REQUIREMENT PLAN AND PLUG IN WITH OTHERS FACTOR IE ARRIVAL CURVE, FFM RATE, MACHINE PPH ETC